Aqua Enviro collaborates with I-Phyc to investigate microalgae reuse

Aqua Enviro have secured a project to investigate beneficial use of algae grown as part of a wastewater tertiary treatment process.

UNITED KINGDOM, JAN 14, 2019 — Aqua Enviro have secured a project to investigate beneficial use of algae grown as part of a wastewater tertiary treatment process.

As part of an Innovate UK grant titled “Commercial use of biomass generated by microalgal treatment of wastewater”, Industrial Phycology (I-Phyc) have commissioned Aqua Enviro to carry out market research in the wastewater and biomass sectors.

Aqua Enviro will carry out the market research to assess the viability and economics of recycling algae generated from wastewater treatment by the I-Phyc patented algae reactor.

In the domestic wastewater market, I-Phyc have been developing an algae reactor to remove phosphorus from wastewater as an alternative to metal ion dosing (commonly Ferric Sulphate) which is the method of choice currently within the UK Water Companies. The reactor is initially targeted at small wastewater treatment works with a domestic population of less than 1000.

The algae reactor has also been successfully used for treatment of domestic wastewaters and wastewaters from fruit juice, tin mining and dairy farming.

The objective of this project is to identify possible markets for algal biomass produced from the treatment of different wastewaters.

Aqua Enviro will aim to investigate the following uses for the algal biomass:

Anaerobic digester feed
Fertilizers
Pigments
Biofuels and Biolubricants
Animal & fish feed & Omega 3 oils
Plastics & Foams for commercial products
Bioresins

Lucie Novoveska, Chief Scientist at I-Phyc said “This is a great opportunity to move towards chemical free wastewater treatment and with the potential to produce a valuable by-product allowing us to approach a more environmentally friendly method of removing phosphorus from wastewater.”

Subscribe our newsletter

Please Subscribe our news letter and and get update.

Setup A New Service Application

RULES FOR SERVICE
  1. Service Agreement must be signed
  2. Membership fee for owners – homeownership, for renters - $200
  3. Administration fee - $25 for all residents
  4. Bills are mailed on the 1st and payable upon receipt or by 5pm on 20th of the month
  5. Make payments to Conroe Bay Water Sewer Supply Corporation P.O. Box 222222
  6. Payments received after 5p.m. on the 20th of the month are assessed a 10% late charge
  7. Termination results in a $25 disconnect fee and a $25 re-connect fee plus all account balances
  8. Service will be terminated if payment is not received by last day of month
  9. If service is terminated due to non-payment, we must receive payment by 12p.m. for water to be reinstated the same day
  10. $75 Tampering fee is applied if meter has been tampered with
  11. $35 “Return Check“ fee is applied for all returned checks
  12. Frequent returned checks will require Credit Card Payments only
  13. WWUI offers online payment via the CBWSSC web page, electronic and credit cards will be accepted
  14. Moving without 30 day notice will result in forfeiture of deposit
  15. Phone number for any problems with billing or water service -

Agreement

  1. SERVICE AGREEMENT
    Conroe Bay Water Sewer Corporation is responsible for protecting the drinking water supply from contamination or pollution which could result from improper system construction or configuration on the retail connection owner's side of the meter. The purpose of this service agreement is to notify each customer of the restrictions which are in place to provide this protection. The public water system enforces these restrictions to ensure the public health and welfare. Each retail customer must sign this agreement before Conroe Bay Water Sewer Corporation will begin service. In addition, when service to an existing retail connection has been suspended or terminated, the water system will not re- establish service unless it has a signed copy of this agreement.
  2. PLUMBING RESTRICTIONS
    The following unacceptable practices are prohibited by State regulations.
    1. No direct connection between the public drinking water supply and a potential source of contamination is permitted. Potential sources of contamination shall be isolated from the public water system by an air-gap or an appropriate backflow prevention device.
    2. No cross-connection between the public drinking water supply and a private water system is permitted. These potential threats to the public drinking water supply shall be eliminated at the service connection by the installation of an air-gap or a reduced pressure-zone backflow prevention device.
    3. No connection which allows water to be returned to the public drinking water supply is permitted.
    4. No pipe or pipe fitting which contains more than 0.25% lead may be used for the installation or repair of plumbing at any connection which provides water for human use.
    5. No solder or flux which contains more than 0.2% lead can be used for the installation or repair of plumbing at any connection which provides water for human use.
  3. SERVICE AGREEMENT
    The following are the terms of the service agreement between Conroe Bay Water Sewer Corporation (the Water System)
    1. The Water System will maintain a copy of this agreement as long as the Customer and/or the premises is connected to the Water System.
    2. The Customer shall allow his property to be inspected for possible cross- connections and other potential contamination hazards. These inspections shall be conducted by the Water System or its designated agent prior to initiating new water service; when there is reason to believe that cross- connections or other potential contamination hazards exist; or after any major changes to the private water distribution facilities. The inspections shall be conducted during the Water System's normal business hours.
    3. The Water System shall notify the Customer in writing of any cross- connection or other potential contamination hazard which has been identified during the initial inspection or the periodic re-inspection.
    4. The Customer shall immediately remove or adequately isolate any potential cross-connections or other potential contamination hazards on his premises.
    5. The Customer shall, at his expense, properly install, test, and maintain any backflow prevention device required by the Water System. Copies of all testing and maintenance records shall be provided to the Water System.
  4. ENFORCEMENT
    If the Customer fails to comply with the terms of the Service Agreement, the Water System shall, at its option, either terminate service or properly install,test, and maintain an appropriate backflow prevention device at the service connection. Any expenses associated with the enforcement of this agreement shall be billed to the Customer

Statement of Responsibility
It is the customer's responsibility to ensure that the home is prepared for water service. Any leak after the meter, or inside the home, or damages arising from a leak or fixtures left open inside the home, will be the customer's responsibility.